PARTS REQUIRED:
x18
x1
Temporary Brace
TJ
2 x 4 x 92-5/8" (5,1 x 10,2 x 235 cm)
BEGIN
1
Remove temporary brace OO from installed 10' wall.
Place 2nd 18' wall centered on floor.
1-1/2" (3,8 cm) overlap is to the top.
Use TJ as a temporary brace as shown.
Secure TJ with (2) 3" screws.
2
Secure wall with (1) 2" screw through
gable wall panel into 10' wall bottom
and top plates (Fig. A, Fig. B).
ENSURE PANEL CORNERS ARE FLUSH.
Secure wall to bottom plate first.
3
Nail lower edge of wall panels
to floor frame with 2" nails
spaced 6" apart.
Angle nails into floor frame
(Fig. C).
Secure wall bottom plates to
floor with 3" nails (Fig. C).
4
Nail 18' wall panel to 10' wall
stud with 1-1/2" nails spaced
6" apart.
5
Secure gable wall top plate
with (1) 3" screw at the
corner at an angle as shown
(Fig. D).
FINISH
Your 2nd 18' wall is now installed.
18' EAVE WALL INSTALLATION
x3
3" (7,6 cm)
6"
(15,2 cm)
2" (5,1 cm)
Nails
2" (5,1 cm)
Nails
Nail 2" nails first.
3" (7,6 cm)
x13
1-1/2" (3,8 cm)
1-1/2"
(3,8 cm)
TJ
3" (7,6 cm)
Nails
Fig. C
40
x2
2" (5,1 cm)
x41
2" (5,1 cm)
3" (7,6 cm)
Screws
2" (5,1 cm)
Screw
3" (7,6 cm)
Screw
3" (7,6 cm)
Nails
1-1/2" (3,8 cm)
2" (5,1 cm)
Fig. B
Screw
Flush
Fig. A
Fig. D
6"
(15,2 cm)
Nails