Installation - Ulvac MBD Series Instruction Manual

Cryo-meter
Table of Contents

Advertisement

CRYO METER MBD series Instruction Manual
4.

Installation

Follow the instruction below to install the MBD on your display panel with a clamp kit.
After installing the MBD, connect cables to the MBD.
A clamp kit and cables are provided with the MBD.   
(1) Insert the MBD from the front through the rectangle hole of your panel as shown below. 
(2) Fix the clamp holders on top and bottom or
left and right sides of the MBD. 
(3) Tighten the set screws to mount the MBD firmly. 
4
(Panel cut)
(Inside of the user's cabinet.)
(Front)
ULVAC CRYOGENICS INCORPORATED
-0.0, +0.5
92
(1)
Clamp holders mounting positions
(3)
Tighten with a slotted screwdriver
(3)
User's cabinet panel
–0.0, +0.5
45
(Left and right)
(2)
OR
Clamp holders mounting positions
(Top and bottom)
(2)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mbd-sMbd-t

Table of Contents