Figure 4-2 Wiring Of Mbd-S/Mbd-T And Mbs - Ulvac MBD Series Instruction Manual

Cryo-meter
Table of Contents

Advertisement

CRYO METER MBD series Instruction Manual
MBS
A
B
POWER
C
RELAY
< 20K
> 280K
+
A
ANALOG
B
-
OUT
+
A
K(CA)
-
B
 
(Note: Wirings indicated with dotted line needs to be done by users.)
Figure 4-2
Conduit Requirements for MBD wiring
To prevent interference during the operation, there should be a separate conduit for each
signal line, control line and AC power line. Especially ANALOG signal line of MBS must be
in separate conduit from other equipments or AC power lines or control lines for other
equipments. Otherwise, MBS operation will be interfered.
If separate conduits cannot be supplied, keep enough distance (generally 300mm or more)
between different wirings. It is effective to prevent interference.
6
(*2) MBS-MBD connecting cable (5m)
Twisted shielded cable
A
B
C
D
E
Twisted shielded cable
AWG #2
Wiring of MBD-S/MBD-T and MBS
ULVAC CRYOGENICS INCORPORATED
(*2)
(*2)
2
AWG #24, or 0.3mm
 max. 
2
4, or 0.3mm
 max. 
CAUTION
[Userʼs control panel]
MBD
A
B
POWER OUT
C
A
ANALOG IN
B
Power cable
MBD-S: AC100V Plug
M
BD-T: Terminal connection (AC100-200V)
Us
er equipment sid
e
DIGITAL IN
User equipment side
K thermocouple IN