Vaderstad E-Services TPF Series Instructions Manual page 45

Table of Contents

Advertisement

fact that it takes a certain amount of time for the product
to be transported before it reaches the ground. To
compensate for this, you can specify turn-on and turn-off
times.
SC on
The time it takes from when a motor starts
time
up to when the product reaches the ground,
measured in ms (milliseconds). This
means that 1 second will be entered as
1000 (ms), and 1.75 seconds as 1750 (ms).
SC off
The time it takes from when a motor stops
time
to when the product ceases to be delivered,
measured in ms (milliseconds). This
means that 1 second will be entered as
1000 (ms), and 1.75 seconds as 1750 (ms).
Time for
fertiliser
TPF
1000
TPR
1000
TPR
3
1000
TPT
1000
TPV
2500
Note that the above values should only be
considered as guidelines and may need to be
adjusted on site according to prevailing
conditions.
3.
3m frame with 4 or 6 rows.
903075-en-gb; 07.06.2017
Time for
Time for
seed
micro-
granulate
300
800
300
800
300
800
300
800
300
800
Task Control parameters
41

Advertisement

Table of Contents
loading

Table of Contents