Post-Connection Check - Endress+Hauser Liquicap M FTI51 Operating Instructions Manual

Capacitive level limit switch
Hide thumbs Also See for Liquicap M FTI51:
Table of Contents

Advertisement

Wiring
52
4.12

Post-connection check

After wiring the measuring device, carry out the following checks:
• Is the terminal assignment correct?
• Is the cable gland tightly sealed?
• Is the housing cover screwed on all the way?
• If a power supply is present: If the device is operational, the green LED flashes at 5-second
intervals.
Liquicap M FTI51, FTI52
Endress+Hauser

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liquicap m fti52

Table of Contents