Commissioning
!
56
6
Commissioning
6.1
Installation and function check
Make sure that the post-installation check and final check have been completed before you start
your measuring point:
• For the "Post-installation" checklist, refer to Page 41.
• For the "Post-connection" checklist, refer to Page 52.
6.2
Commissioning the electronic inserts
FEI51, FEI52, FEI54, FEI55
This chapter describes the process for commissioning the device with electronic insert versions
FEI51, FEI52, FEI54, FEI55.
Note!
• When you start up the device for the first time, the output is in safe status.
This is signaled by the flashing yellow LED 6.
• The device is not operational until you have carried out a calibration.
To attain maximum operational safety, carry out an empty and a full calibration. This is
particularly recommended for critical applications.
Refer to the following subchapters for information on how to carry out the calibration.
6.2.1
Basic settings: overview
Setting the measuring range, chapter 6.2.2
Carrying out
empty calibration
chapter 6.2.3
Carrying out switch
point adjustment
chapter 6.2.7
Reset calibration, two-point control, build-up mode
s
witching delay, s
SIL mode, measuring range
restore factory setting
chapter 6.2.x
Carrying out
Carrying out empty
full calibration
and full calibration
chapter 6.2.4
chapter 6.2.5
Carrying out switch
point adjustment
chapter 6.2.7
elf-test,
MIN-/MAX failsafe mode,
, u
p-/download sensor DAT,
Operation
Liquicap M FTI51, FTI52
,
(optional)
Endress+Hauser
BA381Fen027