Installation Instructions - Endress+Hauser Liquicap M FTI51 Operating Instructions Manual

Capacitive level limit switch
Hide thumbs Also See for Liquicap M FTI51:
Table of Contents

Advertisement

Installation
Installation conditions
!
26
3.2

Installation instructions

Liquicap M FTI51 (rod probe) can be installed from above, from below and from the side.
Liquicap M FTI52 (rope probe) can be installed vertically from above.
Note!
• The probe may not come into contact with the container wall! Do not install probes in the area
of the filling curtain!
• When using in agitating tanks, make sure you install at a safe distance from the agitator.
• If there are strong lateral loads, use rod probes with ground tube.
For electrically conductive tanks e.g. steel tanks
MAX
MAX
MIN
MIN
For nonconductive tanks e.g. plastic tanks
MAX
MAX
Probes with ground tube and grounding
Liquicap M FTI51, FTI52
MAX
MAX
MIN
MIN
MAX
MAX
MIN
MIN
L00-FTI5xxxx-11-06-xx-xx-001
L00-FTI5xxxx-11-06-xx-xx-002
Endress+Hauser

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Liquicap m fti52

Table of Contents