Post-Connection Check - Endress+Hauser OFTE20 Operating Instructions Manual

Point level switch
Table of Contents

Advertisement

Wiring
5.2.2
Inserting the cable
 10
Removing the housing cover and inserting the cables
 11
Connecting the cables to the terminals
5.3

Post-connection check

Device condition and specifications
Are cables or the device damaged?
Electrical connection
Does the supply voltage match the information on the
nameplate?
Are the mounted cables connected correctly and strain-
relieved?
Are the cable glands securely tightened?
16
Notes
Visual inspection
Notes
→  1,  7
-
-
Point level switch
A0017367
A0017366

Advertisement

Table of Contents
loading

Table of Contents