38
Smart Shop "M" Maker 2 - 3 Phase Power
Setting "XY" Work Origin
Verify Coordinate System (Figure #1).
a.) Workpiece 1 should be selected.
Setting "XY" Work Origin SECTION (Cont'd.)-Verify Coordinate System (See Photo Illustration Below)
Figure #1-Control Screen after Loading Program and Setting Work Origin.
b.) If not in work piece, hold Menu& "1"Buttons together & release.
To change to Workpiece 1,
Press & Hold Down "MENU"Button --> Press"C+/1 Button", then release both buttons.