Understanding Work Coordinate Systems - laguna Smart Shop M2 Owner's Manual

3 phase power
Table of Contents

Advertisement

56
Smart Shop "M" Maker 2 - 3 Phase Power

Understanding Work Coordinate Systems

Machine Coordinates (Workpiece 0).
Coordinates based off of the home switches, not the origin.
Tool positions and TTO switch location are set relative to machine coordinates.
Press "MENU + ZRN/0" to switch to "Workpiece 0".
Hold down the MENU + 1-9 Buttons to move between different origin points.
(This Machine can have up to 9 Origin Points on the Handheld at the same time).
In the picture below the Active Work Coordinate System is "Workpiece 2".
Transitioning between workpieces will, in turn transition between X, Y, and Z offsets made in each Workpiece.

Advertisement

Table of Contents
loading

Table of Contents