Smart Shop "M" Maker 2
31
Multiple Tool Program
Tool Cone Set-Up
This section is a work flow, from turning the machine on, to starting your program.
This walk through assumes only TOOL 1 is used.
1.Power on Machine.
2.Home Machine.
3.Verify that the machine is connected to an air supply.
*1.) "Power on Machine"
•Turn the rotary switch to the "ON" position.
•Turn the key to the "ON" position.
•Press the Control Power "ON/OFF" button located on the control panel.
*2.) "Home Machine"
"Verify that the machine is connected to an Air Supply."
a.The tool changer needs 6 bar-6.5 bar or 87 psi-95 psi.
b.Use the pressure regulators (See Figures Below) on the back of the machine to adjust air pressure.
Set 6 bar-6.5 bar or 87 psi-95 psi
Set at 0.5 psi or 7.25 psi