Smart Shop "M" Maker 2 - 3 Phase Power

Machine Set-up

CNC Machine Smart Shop ll
IMPORTANT: In order for installation to be efficient and cost effective we require several items to be completed
PRIOR to our technician's arrival.
Should you have any questions please feel free to call our Customer Service at 1-800-234-1976 or contact your
sales representative.
Following are the steps you have to perform in order for us to schedule the set-up/training. Please check all steps
stated below as the action is need to be completed:
1.Remove all protective coating and packaging.
2.Check if machine has all the tooling (kits, etc.) components that were placed in your order.
3.Make sure that Area where the machine will be placed has appropriate electrical voltage and amperage per
machine(s)? *Electricians and service staff are welcome to contact our Customer Service if they have any
questions.
4.Make sure main power is pulled or is near the cabinet and the vacuum pump(s) ready to be connected.
5.Make sure the machine(s) are leveled with the leveling feet installed.
6.Clean dry air is vital for the machine(s) performance. Make sure the clean dry compressed air is attached to the
machine(s).
7.Prepare adequate supply of materials for practice cutting as well as several 3/4" MDF sheets for use as spoil
boards (material to be cut and tested on).
8.Make sure the Associates that are selected to operate the chosen machine that are to be trained learn the