To control I-demand function
RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
Use of the optional PCB KRP58M51 enables the use of an external time clock.
Same as with the automatic control, priority for capacity can be set. Priority for
capacity will be activated by changing field setting 2.01-02 in combination with the
closed contact on KRP58M51.
Item
1
Capacity priority
setting
The night time low noise operation will be overruled in the following conditions:
Pump down residual operation
Startup control
Defrost operation
Oil recovery
Set a limitation towards the power consumption of the system (e.g. budget control,
limit power consumption during peak moments, ...).
3 different demand settings can be selected by using terminal X801M:
Demand 1: Close the contact between COM and contact 1 of the X801M
terminal.
Demand 2: Close the contact between COM and contact 2 of the X801M
terminal.
Demand 3: Close the contact between COM and contact 3 of the X801M
terminal.
a
X801M
3
2
1
LNOP
COM
a
Power supply connector (on outdoor PCB X77A)
b
Transmission connector (on outdoor PCB X6A)
Specification
Output on terminal X801M
Maximum wire length
Demand 1
Power consumption limitation in function of setting on DS1.
ON
OFF
1
2
3
4
a
Shows the position of a switch
Display
2.01
1
2
DS1
ON
OFF
1 2 3 4
X800M
X801M
LNOP COM
3
2
1
Value
12 V DC
12 mA
100 m
a
6
Technical data
|
Content
Off
On
b
Service manual
177