Third Party Components; Electrical Circuit; Checking Procedures - Daikin Sky Air Advance RZA200D7Y1B Service Manual

Hide thumbs Also See for Sky Air Advance RZA200D7Y1B:
Table of Contents

Advertisement

4 Third party components

4.1 Electrical circuit

4.1.1 Checking procedures

To check the power supply of the unit
To check if the power supply is conform with the regulations
To check the rectifier voltage
RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see
1 Check that the power supply cables and earth connection are firmly fixed to
the power supply terminal X1M.
2 Measure the insulation resistance between each power supply terminal and
the ground using a megger device of 500  V  DC. All measurements MUST be
>1MΩ. If insulation resistance is <1MΩ, earth leakage is present.
3 Turn ON the power using the respective circuit breaker.
4 Measure the voltage between the phases L1‑L2‑L3 on the power supply
terminal X1M. The voltage MUST be 400 V AC ± 10%.
5 Measure the voltage between each phase and N on the power supply terminal
X1M. The voltage MUST be 230 V AC ± 10%.
6 Unbalance between the phases MUST NOT exceed 2%.
Is the measured voltage (power supply)
correct?
Yes
No
1 Check that the power source is in line with the requirements described in the
databook.
Is the power supply conform with the
regulations?
Yes
No
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see
1 Unplug the rectifier voltage check connector X3A from the fan inverter PCB.
4
Third party components
|
"3.12 Plate
work" [
Action
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Adjust the power supply, see
"4.1.2 Repair
procedures" [
Action
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Adjust the power supply, see
"4.1.2 Repair
procedures" [
"3.12 Plate
work" [
4
 111].
4
 137].
4
 137].
4
 111].
Service manual
135

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza250d7y1b

Table of Contents