Commissioning

!
50
6
Commissioning
6.1

Installation and function check

Make sure that the post-installation check and final check have been completed before you start
your measuring point:
• For the "Post-installation check" checklist, refer to → Page 37.
• For the "Post-connection check" checklist, refer to → Page 47.
6.2
Commissioning the electronic insert
FEI52, FEI54, FEI55
This chapter describes the commissioning of the Liquicap M FTI51, FTI52 with the electronic
inserts FEI52, FEI54, FEI55. These electronic inserts operate with the following firmware (FW):
• FW electronic insert FEI52: V 01.00.00
• FW electronic insert FEI54: V 01.00.00
• FW electronic insert FEI55: V 01.00.00
Note!
• When you start up the device for the first time, the output is in safe status. This is signaled by the
flashing yellow LED 6.
• The device is not operational until you have carried out a calibration. To attain maximum
operational safety, carry out an empty and a full calibration.
This is particularly recommended for critical applications.
Refer to the following subchapters for information on how to carry out the calibration.