Maintenance Peristaltic Pump - M&C PSS Series Instruction Manual

Gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

4. Lightly push the heat exchangers with rotation back into the push-in opening of the cooling block
and press to the upper block;
5. Remove the adhesive tape and any surplus thermal conductivity paste;
6. Reconnect the tubing.
Note
15.2

MAINTENANCE PERISTALTIC PUMP

Note
Before starting any maintenance work, make sure that any work done on the device is in compliance
with all relevant regulations and standards.
Warning
Warning
www.mc-techgroup.com
Do not confuse tubing. The upper heat exchanger connection is the inlet, the
side heat exchanger connection is the outlet and the lower heat exchanger
connection is the condensate outlet.
Detailed technical information about the peristaltic pump can be found in the
SR25.1 instruction manual.
The instruction manual can be found at www.mc-techgroup.com
Inhalation hazard possible, if using toxic or asphyxiant gases!
Purge peristaltic pump with inert gas or air before opening! If the pump is
used for toxic gas or asphyxiant (oxygen-displacing) gas, it needs to be
purged with inert gas or air before opening. Follow closely all relevant
occupational safety regulations during operation.
Disconnect power supply before opening the device for access.
Make sure that all external power supplies are disconnected.
Aggressive condensate possible!
Media residues in tubing!
Chemical burns caused by aggressive media possible!
Wear protective gloves and protective glasses!
Wear proper protective clothing!
SS-M05_Marine | 1.01.00
29

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ss-m0503g6000

Table of Contents