11.1

CONNECTING THE SAMPLE GAS LINE

Note
The sample gas line is connected to the inlet of the external heat exchanger. The heated part of the
sample gas line should end approx. 30 cm in front of the heat exchanger.
The electrical connection of the sample gas line is made via the cable gland K1 at the upper left corner
of the SS-M05 system cabinet. The outlet of the heat exchanger must be connected to media
connection 1.
Cable gland K1
Figure 3
Sample gas line connection
18
Do not use the gas conditioning device at temperatures other than
those specified. This avoids false alarms and ensures the operational
safety of the gas conditioning system and the additionally connected
analyzer.
Downstream analysers and the unheated Teflon tubing must always
be operated at temperatures well above the specified gas output dew
point of +5 °C.
Unheated gas sample lines must be installed with a slope down to the
cooler. Condensate pre-separation is then not necessary.
Do not mix up connections. The upper heat exchanger connection is the
inlet, the side heat exchanger connection is the outlet and the lower heat
exchanger connection is the condensate outlet.
Media connection 1
SS-M05_Marine | 1.01.00
Heat exchanger inlet (A1) and outlet
www.mc-techgroup.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ss-m0503g6000

Table of Contents