OPERATION
Pump Test
(user to block the inlet for PASS)
Fig. 3-12 TRAC Warm-up
Calibration Date Features
At the end of warm-up and before the First Responder CG
is ready for measuring, the instrument will indicate on the
display, how many days remain until calibration is required,
as shown in Figure 3-13:
3-15