Section 2 Operating Principles; General Overview; Explanations Of Functions; Power Supply Values - NUVE OT 020 Service Manual

Bench top steam sterilizers
Hide thumbs Also See for OT 020:
Table of Contents

Advertisement

2.1. GENERAL OVERVIEW

The OT 020 and OT 020V can be split into 4 main groups,

Power supply values

Control unit
Heating unit
Water and steam unit
2.2. EXPLANATIONS FOR THE FUNCTIONS
2.2.1. Power Supply
The power supply values are listed below.
Glass Fuse
OT 020
10 A
OT 020V
10 A

2.2.2. Main PCB

The microprocessor controlled main PCB operates on "proportional" heating system. The main PCB
first prepares steam at the required temperature and pressure in the sterilization chamber. Then, it
carries out the sterilization, steam discharge and drying phases as explained in the section 1.2 At the
end of the phases, the sterilizer warns the users with an audible alarm that the cycle has ended.
SECTION 2
OPERATING PRINCIPLES
Power Supply
1500 W
1550 W
Power inlet
230 V, 50 Hz
230 V, 50 Hz
4
Heater Supply
Stainless tube type
(1450 W)
Stainless tube type
(1450 W)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ot 020v

Table of Contents