Download Print this page

OLT 8x8 Pine SpaceMaker Assembly Manual page 10

Advertisement

25.
In the next steps, the Door Header is attached. There are 2 short and 1 long 2" X 3" pieces . Start
by attaching both short end pieces using 2 - 2 1/2" screws. Screw from top down into wall framing.
26.
Position and attach the longer Door Header to wall framing when Header is sitting flush with
inside of wall framing and against shorter Door Header end pieces. Attach with 4 - 2 1/2" screws.
27.
Locate both Vertical Door Jambs and position flush against front narrow wall stud. The Jamb is 3"
wide and will sit flush to outside of wall siding. When positioned correctly, secure Jamb using 4 - 2 1/2"
screws. Complete both sides.
Toll Free 1-888-658-1658
www.outdoorlivingtoday.com
Page 10
Sits flush with inside
of wall framing
sales@outdoorlivingtoday.com

Advertisement

loading