Download Print this page

OLT 8x8 Pine SpaceMaker Assembly Manual page 5

Advertisement

7.
Attach Floor Runners to completed floor
frame. There are 2 floor runners per 91" side and
5 completed runners in total. Use 3 - 2 1/2"
screws per Runner.
9.
Complete all Floor Runners.
Foundations
Note: The floor will be flipped over and floor
runners will sit on your foundation. It is
important to note that having a level
foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
Toll Free 1-888-658-1658
8.
Make sure Runners are flush with outside and
front and rear floor framing but not overhanging.
Concrete Slab
Foundation
10.
With Floor Runners attached, carefully flip the
floor over and place on your foundation.
Caution- you will need 2 people to assist you. Be
careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
11.
Position Plywood
Floor pieces (4) on top
of completed floor joists.
Plywood will sit flush with
outside of floor joist
frame.
www.outdoorlivingtoday.com
Page 5
sales@outdoorlivingtoday.com

Advertisement

loading