C. Rafter and Roof Section
Exploded view of all parts necessary to complete the Roof Section.
Identify all parts prior to starting.
Plywood
Roof Panels
(2)
72 1/4" x 48"
Plywood Roof
Panels (2)
26 3/4" x 9 1/4"
Ridge Boards (4)
57 1/2" and
33 1/2" long
Roof
Gussets
(2)
Ridge Board
36.
Locate 3/4" x 4 1/2" x 57 1/2" & 33 1/2" Ridge Boards and attach together with Metal
Ridge Board Connector using 8 - 3/4" screws. Total Length when connected is 91".
Complete two Sets. Position Metal Ridge Board Connector evenly on Ridge Boards.
Toll Free 1-888-658-1658
Metal Ridge
Board
Connectors (2)
Ridge Board
www.outdoorlivingtoday.com
Soffits (4)
1/2" x 4 1/2" x 45 1/2"
8 - 3/4" screws
Page 14
Plywood
Roof Panels
(2)
26 3/4" x 48"
Plywood Roof
Panels
(2)
72 1/4" x 9 1/4"
Roof
Rafters
(12)
sales@outdoorlivingtoday.com