Download Print this page

OLT 8x8 Pine SpaceMaker Assembly Manual page 17

Advertisement

43.
Place 2nd completed Rafter Section on gable wall framing. Position as per Steps 41 & 42.
Gable Notch
45.
With both Rafter Ridge Boards
connected. Completely secure
Gable framing to both outside rafters
with 8 - 2" screws per gable side.
Toll Free 1-888-658-1658
Completed left side Rafters
Offsetting Metal
Ridge Board
Connectors
www.outdoorlivingtoday.com
Page 17
44.
At the peak, align Ridge Boards so
they are flush together and secure them
with 8 - 1 1/4" screws.
To completely secure Ridge Boards,
place 4 - 1 1/4" screws into any of the
remaining Metal Ridge Board Connectors
holes. Complete both sides.
Important- if there is a gap between
Ridge Boards, try pushing side walls
closer together from outside. Walls
should be 91" apart at top from inside of
wall plate to wall plate.
sales@outdoorlivingtoday.com

Advertisement

loading