7.1 Hoisting an RRU onto a Tower

This section describes the procedures and precautions for hoisting an RRU and its mounting kits
onto a tower. In tower-mounted scenarios, the RRU can be installed on a pole, U-steel, or angle
steel.
Prerequisites
When the RRU is powered by an AC/DC power module, you need to install the AC/DC power
module onto the RRU before hoisting them onto a tower. For detailed operations, see AC/DC
Power Module User Guide or OPM15M User Guide.
l Place a foam pad or cardboard on the ground to protect the housing of the RRU from damage
l The routing and protection of power cables should follow the local safety regulations,
Procedure
Step 1 After climbing up to the tower, technician A secures the fixed pulley to the tower platform
support and leads the lifting sling through the fixed pulley.
Step 2 Technician C binds the mounting kits using the lifting sling and traction sling on the ground, as
shown in
pulls the traction sling outwards to protect the mounting kits from colliding with the tower.
Figure 7-1 Binding mounting kits for the RRU
Issue 05 (2014-06-30)
NOTICE
before the binding. Do not stand the RRU upright because the RF ports cannot support the
weight of the RRU.
industry standards, and enterprise standards of the operator.
Figure
7-1. Then technician B pulls the lifting sling downwards, and technician C
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru3632

Table of Contents