RRU3832&RRU3632
Installation Guide
3.
4.
Issue 05 (2014-06-30)
Figure 7-7 Binding fiber optic cables
(1) Lifting sling
NOTICE
Do not remove the stretch sling and protection pipe or bind fiber optic cables using one
sling, as shown in
Figure
Figure 7-8 Incorrect binding method
Installation engineer B rotates the fiber spools at the speed of 5 m (16.4 ft) to 15 m (49.21
ft) per minute to coil the fiber optic cables.
Installation engineer C pulls the lifting sling downwards, and installation engineer D pulls
the traction sling outwards to protect the fiber optic cables from colliding with the tower.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Hoisting an RRU and Related Cables onto a Tower
(2) Stretch sling
7-8.
(3) Traction sling
47