Huawei RRU3832 Installation Manual page 82

Table of Contents

Advertisement

RRU3832&RRU3632
Installation Guide
1.
2.
Step 2 Place the pole installation bracket against the installation position, use a level to verify that the
pole installation bracket is placed horizontally, and then mark anchor points with a marker, as
shown in
Figure 8-35 Marking anchor points
(1) Level
Step 3 Drill holes at the anchor points, and then insert expansion anchor bolt assemblies, as shown in
Figure
Issue 05 (2014-06-30)
Use an M6 inner hexagon torque screwdriver to remove the four inner hexagon screws on
the pole installation bracket, and remove the main bracket from the pole installation bracket.
Use an M10 torque wrench to loosen the nuts on the two square-neck bolts, and remove
the plastic cap, nuts, spring washers, flat washers, square-neck bolts, and pole installation
bracket from the auxiliary bracket.
Figure
8-35.
(2) Pole installation bracket
NOTE
It is recommended that the pole installation bracket be installed at a height of 1200 mm (47.24 in.) to 1600
mm (62.99 in.) above the ground.
8-36.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Installing the RRU
(3) RRU
73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rru3632

Table of Contents