7
Electrical installation
7.1
General electrical installation procedure
Preliminary requirements
Procedure
1. Install the AC input cable.
2. Install the Ethernet cable.
3. If necessary, install the cables for smart meter communication.
4. If you want to use the internet, insert the Nano-M2M SIM card. Refer to section
5. If necessary, replace the EV charge cable. Refer to section 7.5.
7.2
Insert the AC input cable
7.2.1
Install the cold-pressed terminal for PE
Preliminary requirements
Procedure
1. Strip the wires. For the
2. Insert the cable into the cold-
3. Finished.
•
•
Insert the AC input cable. Refer to section 7.2.
•
Connect the AC input cable. Refer to section 7.3.
•
Insert the Ethernet cable. Refer to section 7.4.1.
•
Connect the Ethernet cable. Refer to section 7.4.2.
•
Insert the cables for smart meter communication. Refer to section 7.4.3.
•
Connect the cables for smart meter communication. Refer to section 7.4.4.
7.4.5.
•
Crimping Tool
•
Cold-pressed terminal for
PE. Refer to section 10.6.
specification, refer to section
10.12.1.
pressed terminal to its full
insertion length. Crimp the
cold-pressed terminal with the
correct jaws.
Electrical installation
•
AC input cable (1 phase)
•