Equipment Installation

9.1

Overview

Installation consists of the following steps:
 Remove / relocate any legacy instrumentation
 Add or locate an appropriate power source / breaker
 Wire power and systems interfaces as needed
 Mount the unit to the instrument panel with supplied screws
 Apply power and perform setup
 Perform system checkout procedures including EMC checks
9.2

Supplied Components

Component
AV-30-C Unit
AV-30-C Installation
Kit
AV-30-C Operating
Software
9.3

Non-Supplied Components

Component
Pitot / Static Tubing
Pitot Static T's
Circuit Breakers (2A)
Power and Interconnect Wire
OAT Probe
9.4

Installation Records

The date of installation should be recorded in the aircraft's log-book.
Entry should include instrument(s) being replaced (AI or DG, or both),
or if the installation is being performed as a non-required instrument.
Entry should also include a description of any optional connections
made.
UAV-1003947-001, AV-30-C, Installation Manual
Part Number
UAV-1003429-001
UAV-1004091-001
UAV-1003494-001
Table 4 – Supplied Components
Description
Length as required
Quantity as required
One required for each instrument
See AC 43.13-1B Chapter 11, Section 7 for
acceptable wire types
Davtron P/N C307PS
Table 5 – Non-Supplied Components
22
Description
AV-30-C Unit
Installation Kit
AV-30-C Operating
Software v1.0.18
Revision C

Advertisement

Table of Contents
loading

Table of Contents