Converting The Valve Terminal; Converting To Multiple Pressure Zones - Festo VTSA-F-CB Manual

Valve terminal
Hide thumbs Also See for VTSA-F-CB:
Table of Contents

Advertisement

Modification
1
2
3
Fig. 44: Assembly of right end plate
1
Manifold sub-base
2
Guide pins
1. Replace damaged seals.
2. Place the seal on the guide pins.
3. Screw in the screws of the components.
4.
Tighten screws.
– Tightening torque: 3.0 Nm ± 10%
5. Place the valve terminal on the mounting surface.
6. Connect pneumatic lines è 7.1.2 Connecting pneumatic lines.
7. Connect electrical cables è 7.2.1 Connecting electrical cables.
11.2

Converting the Valve Terminal

11.2.1

Converting to Multiple Pressure Zones

In order to convert the valve terminal to 2 and more pressure zones, the following components are
required for each pressure zone:
– Separating seal VABD-S6-1-...-C
– pneumatic supply plate with exhaust plate or exhaust air cover VABF-...-1P1A...
Disassembly
1. Disconnect electrical and pneumatic connections.
2. Remove valve terminal from the mounting surface.
3. Place valve terminal on a flat working surface.
4. Loosen the manifold sub-base to which a separating seal is to be fitted è Disassembly.
Festo — VTSA-F-CB — 2021-06a
2
4
3
Seal (optionally with duct separation)
4
Right-hand end plate
81

Advertisement

Table of Contents
loading

Table of Contents