Performing Sample Path And Case Leak Checks - Thermo Scientific 3600 PDM Manual

Personal dust monitor
Table of Contents

Advertisement

Maintenance and Calibration

Performing Sample Path and Case Leak Checks

Performing Sample
Path and Case
Leak Checks
To perform a case leak check:
5-24
PDM 3600 Instruction Manual
Periodically, or if the front cover has been removed for maintenance,
perform a case leak check on the PDM unit. Tool/materials needed for this
procedure include the case leak check suction cup and sample line plug.
WARNING Whenever the PDM case is opened for maintenance, you must
perform a case leak check after reassembling the case. ▲
1. Disconnect the sample line from the cap lamp.
2. Connect the PDM unit to its charger and start the WinPDM software.
3. When in the PDM - COM1 screen, select the "Flow Calibrations"
button to display the Leak Check Routines screen
Figure 5–36. Calibration/audit screen
(Figure
5–36).
Thermo Fisher Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

57-010925

Table of Contents