Repairing/Rebuilding The Cap Lamp - Thermo Scientific 3600 PDM Manual

Personal dust monitor
Table of Contents

Advertisement

Maintenance and Calibration

Repairing/Rebuilding the Cap Lamp

Repairing/
Rebuilding
the Cap
5-36
PDM 3600 Instruction Manual
Figure 5–54. Installing the ferrule and connector
17. Install the blue connectors on the red power wires by screwing them
together firmly.
18. Reinstall the black insulating material onto the cyclone area to cover
the wiring underneath.
19. Install the PDM cover plate (refer to the instructions earlier in this
chapter for information on opening the case).
20. Turn on the cap lamp to ensure that it is functioning.
21. Perform a leak check.
Use the following procedure to repair/rebuild the cap lamp. Tool/materials
needed for this procedure:
Phillips screwdriver
Slotted screwdriver
Lamp
7/64-inch Allen wrench
Cap lamp kit (p/n 113326-00). Includes:
o Lens, headpiece
o Gasket, headpiece
Thermo Fisher Scientific

Advertisement

Table of Contents
loading

This manual is also suitable for:

57-010925

Table of Contents