Preventive Maintenance (Pm) Checklist - Saadat Dena User Manual

Electrocardiograph
Hide thumbs Also See for Dena:
Table of Contents

Advertisement

Chapter 8: Care and Cleaning

Preventive Maintenance (PM) Checklist

The preventive maintenance (PM) checklist #PL-F-33 should be completed by responsible individuals
of healthcare center. It should be noted that PM checklist only is used to perform systematic inspection
of the equipment and will not guarantee their correct function.
Form No. : PL-F-33
State:
Device model:
No.
Visual
1
inspection
2
Display screen
3
Battery
4
Saving date& time settings
5
Saving system settings
6
Accessories
7
Recorder
8
Review
Pass □
Final result:
Expert recommendation:
Name and signature of person in charge:
SAADAT Co.
PM Form ( Electrocardiograph )
City:
Healthcare center:
Serial number:
Test and Inspection Item
No damage or breakage in the case
Correct function of the touch screen
Correct function of the keyboard
Cleaning and disinfection according to the user manual
Correct display of Waveform area and information
Unplugging the system (check the battery function)
Periodic usage of the battery
Check ECG cable (clamps, leadwires, trunk)
Check ECG clip clamp and suction bulb (visual and
sulfation test)
Cleaning and disinfection according to the user manual
Correct function of the recorder
Appropriate size of the recorder paper
Check the eject key function on the recorder door
Check the paper holder
Check the recorder error messages
Check Review window periodically
Fail □
Installation date:
Name and signature of expert:
63
Ward:
Inspection date:
OK
NOK
N/A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dena 650

Table of Contents