Preventive Maintenance (Pm) Checklist - Saadat DENA 650 User Manual

Electrocardiograph
Hide thumbs Also See for DENA 650:
Table of Contents

Advertisement

Chapter 8: Care and Cleaning

Preventive Maintenance (PM) checklist

The preventive maintenance (PM) checklist #PL-F-33 should be completed by responsible individuals of
healthcare center. It should be noted that PM checklist only is used to perform systematic inspection of
the equipment and will not guarantee their correct function.
Form No. : PL-F-33-V1
State:
Device model:
No.
1
2
Visual inspection
3
4
Display screen
5
6
Battery
7
Saving date& time settings
8
Saving system settings
9
10
11
Accessories
12
13
14
15
Recorder
16
17
18
Review
19
Pass □
Final result:
Expert recommendation:
Name and signature of person in charge:
Pooyandegan Rah Saadat Co.
PM Form (DENA 650 Electrocardiograph )
City:
Healthcare center:
Serial number:
Test and Inspection Item
No damage or breakage in the case
Correct function of the touch screen
Correct function of the keyboard
Cleaning and disinfection according to the user
manual
Correct display of Waveform area and information
Unplugging the system (check the battery function)
Periodic usage of the battery
Check ECG cable (clamps, leadwires, trunk)
Check ECG clip clamp and suction bulb (visual and
sulfation test)
Cleaning and disinfection according to the user
manual
Correct function of the recorder
Appropriate size of the recorder paper
Check the eject key function on the recorder door
Check the paper holder
Check the recorder thermal head
Check the recorder error messages
Check Review window periodically
Fail □
Installation date:
Name and signature of expert:
59
Ward:
Inspection date:
OK
Not OK
N/A

Advertisement

Table of Contents
loading

Table of Contents