Download Print this page

Dyson DC15 Service Manual page 42

Hide thumbs Also See for DC15:

Advertisement

service manual
181
Twist the yoke bracket within the channel
until the grommet is exposed.
Release the grommet from the duct. Pull the
PCB to yoke loom out of the duct.
182
To refit the PCB to yoke loom locate the
end into the hole in the base of the duct.
Locate the grommet into the hole ensuring it is
adequately sealed. Reconnect the loom to the
PCB. Dress all wires neatly within the duct
and hold with 3 cable ties. Refit the duct
cover and seal.
183
Re-attach the PCB to yoke loom to the
yoke loom as previously shown. Refit the yoke
cover and the yoke bracket screws.
39
Dismantling the duct assembly
184
Remove the wand handle assembly and
hose/u-bend assembly from the rear of the duct.
Remove the cyclone and bin assembly from the
front of the product. Release the retaining catch
on the rear of the post filter cover only, using a
thin flat bladed screwdriver.
185
Place the cyclone and bin assembly back
onto the post filter cover without clipping it onto
the cyclone release catch. Use the cyclone and
bin assembly to twist the post filter cover over the
two remaining catches on the front of the duct.
Once released the post filter cover can be lifted
off the duct.
Once you have removed the post filter cover
assembly you should continue to remove the
following parts from the duct, as previously
shown, before continuing:
cleanerhead and yoke (pages 6-7)
motor bucket and ball (pages 20-21)
axlestand and stabiliser (pages 27-29)
valve assembly (pages 33-34)
powercord assembly and switches (pages 35-36)
internal cable (pages 37-38)
PCB to yoke loom and
PCB assembly (pages 38-39)
Issued 05/05

Advertisement

loading