Step 1
Step 2
Figure 6.3: Procedure for commissioning
Subject to reasonable modifications due to technical advances.
Pepperl+Fuchs Group • Tel.: Germany +49 621 776-0 • USA +1 330 4253555 • Singapore +65 67799091 • Internet http://www.pepperl-fuchs.com
Parameterisation and operation of the valve coupler
Setup wizard
Start setup wizard
Enter drive design
As an option switch on
"Time Monitoring"
Start initialisation run
Attention: Follow safety indication!
Select "target mode"
PV_D generation - section 6.5.4
Monitoring and diagnosis functions:
valve, drive and valve control system
Complete commissioning
Fieldbus Valve Coupler FD0-VC-Ex4.FF
Start of commissioning
Read manual
Manual configuration
Enter the drive design
"Actuator Fail Action" - section 6.5.3
Parameterisation of final positions
feedback - section 6.5.4
Select "target mode"
Time monitoring
Cyclic functional check
Lead monitoring valve
Lead monitoring sensor
Stroke counter
Enter additional data for
Copyright Pepperl+Fuchs, Printed in Germany
29

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FD0-VC-Ex4.FF and is the answer not in the manual?

Table of Contents