4.1 Operations of Single UPS

1.
Make sure Phase A, B and C are in correct phase sequence, and then supply
power to the UPS.
2.
Turn on the battery (make sure that the battery "+" and "-" terminals are
correctly connected to the UPS terminals).
3.
Turn on the "Input Switch" on the UPS (the AC Input Switch), and the UPS
will start to check its functionality with the cooling fan operating. You will
access the main menu in about 4 seconds. Then please operate according to
the following screen display.
NOTE: The data shown in the following pictures on the operations of 3C3 PRO
80KS are for reference only.
1) Turn on the "Input Switch", and the
UPS will start to check its functionality,
The main menu will be displayed after
15 seconds of inactivity.
3C3 Pro 80 KVA UPS
UPS SELFTESTING
PLEASE WAIT A MOMENT

Chapter 4 Operation

SANTAK
2) Get to the main menu.
LOAD:
I/P VOLT: 226 225 226
O/P VOLT: 0
O/P FREQ: 0.0 Hz
STATUS: Load Off
31
0%
BAT: 0
0
0