Operation; Turning O Nups - Santak CASTLE On-Line Series User Manual

Hide thumbs Also See for CASTLE On-Line Series:
Table of Contents

Advertisement

4.1 Turning On UPS
Note: In order to make sure UPS have enough backup
Time to protect your equipment, The battery must be charging
At least 12 hours before connect to your equipment at the first
time.
Prepare for Turn On UPS
1. Connect UPS to mains power, turn off battery input switch, turn
bypass switch to ON position, inspect battery quantity according
to the LCD display information, if the quantity LCD dis play is
different from the actual quantity, please contact with SANTAK
service hot line or UPS dealer.
2. Turn UPS input switch to ON position, inspect whether the
control LCD panel is same as below, if LCD display ERRO code
on the area where "should be blank", please contact with
SANTAK service hot line or UPS dealer.

4. Operation

- 23 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Castle on-line 3c20ksCastle on-line 3c15ks

Table of Contents