Decommissioning; Decommissioning The Device; Transport; Transporting The Device - Sartorius Cubis MCA Series Operating Instructions Manual

Semimicro, analytical and precision balances
Hide thumbs Also See for Cubis MCA Series:
Table of Contents

Advertisement

Decommissioning

1
102
Operating Instructions Cubis
11
Decommissioning
11.1

Decommissioning the Device

Procedure
Turn the device off.
t
Disconnect the device from the power supply.
t
Disconnect the device from all connected devices and all accessories,
t
e.g. printer or electronics module.
If this relates to a device with an analytical draft shield or flat glass draft
t
shield: Remove the draft shield side panels and upper panel
(see Chapter "9.1 Preparing a Device with an Analytical Draft Shield or
Flat Glass Draft Shield", page 96).
Clean the device (see Chapter 9.3, page 97).
t
Re-insert all components into the device (see Chapter "5.7 Installing a
t
Device with an Analytical Draft Shield or Flat Glass Draft Shield",
page 48, Chapter "5.8 Installing a Device with a Frame Draft Shield",
page 50).
If below-balance weighing has been set up:
t
Turn the device on its side and place it on a soft support base.
t
Remove the hook for below-balance weighing from the thread.
t
Insert the hook for below-balance weighing (2) into its retainer on
t
2
the underside of the weighing module.
Re-insert the cover of the below-balance weighing equipment (1).
t
Place the device on the device base on a level surface.
t

12 Transport

12.1

Transporting the Device

Procedure
CAUTION Risk of injury from breaking glass Glass components can
t
break if they fall or are handled incorrectly. Glass fragments can cause cuts.
Only lift the device by its base, not by the draft shield.
t
When lifting and transporting, ensure that no personnel or objects are
t
in the way.
Use suitable conveyance devices, e.g., trolleys, for long transport routes.
t
MCA
®

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents