Aerohive Networks AP121 Hardware Reference Manual page 79

For aps, routers, and hivemanager devices
Hide thumbs Also See for AP121:
Table of Contents

Advertisement

Chapter 7 The AP340 Platform
Figure 14 Clipping the hanger frame onto the track
6. Insert the hanger clip upward through the center slot in the hanger frame, and then twist it
counterclockwise until the clip snaps into a locked position against the sides of the crossbar (see
Figure
15).
Figure 15 Securing the AP340 to the hanger frame
(Bird's eye view with the ceiling
tiles and ceiling tracks removed
for clarity)
6
Insert the hanger clip up through the
center slot in the hanger frame.
Rotate the AP and the attached
mounting plate counterclockwise
until the clip locks in place against
the sides of the crossbar.
7. Connect one or two Ethernet cables to the network, and—if not using PoE—connect the power cord to
a power source.
8. Replace the ceiling tile to complete the installation.
78
Hanger frame
4
Remove the ceiling tile and
enter the plenum.
5
Press the hanger frame onto
the ceiling track.
AP attached to the mounting plate
Hanger frame
Hanger frame
Aerohive

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents