Oracle Exadata Storage Server X6-2 High Capacity Installation Manual page 45

Table of Contents

Advertisement

Install the Cable Management Arm
The connector B tab (see callout 1) goes into the slide-rail's front slot (callout 2).
Gently tug on the right side of the front slide bar to verify that connector B is
b.
properly seated.
9.
To install the CMA's connector C into the right slide-rail:
Installing the Storage Server Into a Rack
45

Advertisement

Table of Contents
loading

Table of Contents