Section 2: Installation
2.1

Unpacking

2.2

Mounting and Installation Guidelines

Cable fittings
supplied are weather-
resistant. They are NOT
certified as explosionproof
(XP) or flameproof (d)
unless they are specifically
marked.
Carefully remove the contents of the shipping carton and check
each item against the packing list before destroying any packing
material. If there is any shortage or damage, report it to the
factory immediately.
CAUTION:
The IntelliPoint RF instrument must NOT be powered
BEFORE it is installed in an application and material
must be BELOW sensing element.
The IntelliPoint RF instrument can be mounted vertically,
horizontally, or at an angle. Mounting location should be as
free as possible from vibration, corrosive atmospheres, and
any possibility of mechanical damage. Ambient temperatures
at electronics should be between limits as specified by control
drawings in section 6.
The IntelliPoint RF instrument utilizes a dual compartment
housing and a completely encapsulated input/ output module
to reduce possibility that damage may occur from water
migrating into housing through conduit. To further reduce
possibility of damage caused by water in the conduit, install
a drip loop and breather drain to purge any accumulating
moisture, See Figure 2.1.
Wrong
Nozzle too long;
Cote-shield too short.
Good
Long Nozzle
Factory-supplied Cote-shield
extends through nozzle and
wall build-up.
Recommended Conduit Connection
7
Best
Wall build-up
does not extend
past first
insulator.
Best
No Nozzle
NOZZLE
NOZZLE
Figure 2-1

Installation

Cote-shield must
extend through
nozzle and wall
build-up.