Lonworks - Carrier RTU Open v5 Integration Manual

Hide thumbs Also See for RTU Open v5:
Table of Contents

Advertisement

Communications wiring
Refer to Appendix A (page 41) for the Network Points list.
Refer to Appendix D (page 58) for the Protocol Implementation Conformance Statement.
Software settings defined through the Equipment Touch device. To confirm settings, obtain a Modstat of the
device. On the Equipment Touch, click the link to the Modstat.

LonWorks

WARNING
When you handle the LonWorks Option Card:
Do not contaminate the printed circuit board with fingerprints, moisture, or any foreign material.
Do not touch components or leads.
Handle the board by its edges.
Isolate from high voltage or electrostatic discharge.
Ensure that you are properly grounded.
Refer to Appendix E (page 60) for the LonWorks Protocol Implementation Conformance Statement (PICS).
RTU Open v5
Integration Guide
16
CARRIER CORPORATION ©2019
All rights reserved

Advertisement

Table of Contents
loading

Table of Contents