15. Maintenance and Inspection
15.1 Inspection Items and Timing
Perform maintenance work according to the schedule below.
The schedule is set assuming eight hours of operation a day. When the operation time is long such as
24-hour operation, shorten the maintenance intervals as needed.
Start of operation
After 1 month of operation
After 6 months of operation
After 1 year of operation
Every 6 months thereafter
Every 1 year
15.2 Visual Inspection of the Machine Exterior
Check the following items when carrying out visual inspection.
Body
Loose mounting bolts?
Cables
Damage to cables or connection to connector box?
Stainless sheet
Damage or foreign deposit?
General
Unusual noise or vibrations?
15.3 Cleaning
Clean the exterior as needed.
Wipe off dirt with a soft cloth.
Do not use strong compressed air on the actuator as this may force dust into the crevices.
Do not use petroleum-based solvent on plastic parts or painted surfaces.
If the unit is badly soiled, apply a neutral detergent or alcohol to a soft cloth, and wipe gently.
28
Visual inspection
Check interior
Grease supply