Fayat Bomag BP 25/50 Operating Instruction, Maintenance Instruction page 77

Hide thumbs Also See for Bomag BP 25/50:
Table of Contents

Advertisement

Maintenance – Half-annually
Tightening the V-belt
Fig. 63
Final work
Fig. 64
80
1.
Pull the engine carrier back, until the correct V-belt tension is
reached.
2.
Tighten the fastening screws (1) on both sides.
1.
Assemble V-belt guard (3) with washers (2) and fastening
screws (1).
2.
Check the V-belt tension again after 25 operating hours,
tighten if necessary.
BP 25/50

Advertisement

Table of Contents
loading

Table of Contents