Annually; Checking, Adjusting The Valve Clearance - Fayat Bomag BP 25/50 Operating Instruction, Maintenance Instruction

Hide thumbs Also See for Bomag BP 25/50:
Table of Contents

Advertisement

8.9 Annually

8.9.1 Checking, adjusting the valve clearance

Preparations
Fig. 65
Fig. 66
Perform this maintenance work at the latest after 300
operating hours
NOTICE!
Danger of engine damage!
We recommend to have this work carried out by
trained personnel or our after sales service.
Before checking the valve clearance let the engine
cool down.
After a short test run check the engine for leaks.
Protective equipment:
n
n
1.
Park the machine in secured condition
the machine in secured condition.' on page 56.
2.
Let the engine cool down to 20 °C (68 °F).
3.
Unscrew the fastening screws (1).
4.
Remove valve cover (2) with gasket (3).
5.
Set the piston to top dead centre position of the compression
stroke.
For this purpose align the alignment mark (2) on the starter
disc to the top bore (1).
BP 25/50
Maintenance – Annually
Working clothes
Protective gloves
Ä Chapter 6.5 'Park
81

Advertisement

Table of Contents
loading

Table of Contents