N-Ann-I/O Connection To Facp; N-Ann-I/O Module Led Wiring - Honeywell NOTIFIER RP-2002C Instruction Manual

Agent release panel
Table of Contents

Advertisement

Installation

N-ANN-I/O Connection to FACP

The N-ANN-I/O connects to the FACP via the ANN-BUS as illustrated in Figure 2.23. After the
N-ANN-I/O is connected to the panel, it must be added to the system via FACP programming.
FACP
TB3

N-ANN-I/O Module LED Wiring

There are four 12-pin connectors on the N-ANN-I/O module for connecting LEDs. Each set of 10
LEDs get their power from Pin 11 of the corresponding connector. Internal resistors are sized so
that there is approximately 10 mA of current for each LED. No series resistors are required. LED
outputs are mapped to output circuits. Refer to the section titled "ANN-I/O LED Zone Assign-
ments" on page 72 of this manual.
46
Primary ANN-BUS
Figure 2.23 N-ANN-I/O Connection to FACP
N-ANN-I/O Module
ANN-BUS and power wiring are
supervised and power-limited
RP-2002 Series Manual — P/N 53039:E6 1/26/2017
ANN-BUS Devices

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Notifier rp-2002Notifier rp-2002eNotifier rp-2002 series

Table of Contents