Download Print this page

Band-it IT1000-C Operating Manual page 35

Pneumatic it tools

Advertisement

Operating
Manual
1)
Remove the two cap screws in the Handle Cover with a 4mm hex key. Remove cover and
lay aside during their removal.
2)
The valve used to adjust timing is highlighted in the picture below.
3)
To adjust: Loosen jam nut, and turn adjustment screw clockwise to increase the cutoff delay
and counter-clockwise to decrease the cutoff delay. Once the delay is set, tighten the jam
nut against the adjustment screw.
4)
To test and verify proper adjustment: Connect the tool to the Air Control Module, then turn
supply valve on. Gently kink the coiled air supply tube connected to the bottom Quick
Connect Air Coupling, then activate the Tool Trigger. This action causes the tool to cut off,
allowing the timing to be reviewed. Adjusting the Timing Screw in by ½ turn will slow the
tool's cut-off action. Adjusting the Timing Screw out by a half turn increases the speed of
the cut-off activation. Repeat this entire step until timing is set at a 0.5 – 1.0 second delay.
Caution: Setting timing to less than 0.5s may result in loose clamps.
Cutoff Timing
Valve
Notes:
-Cut-off timing set too short will not allow the clamp to achieve the desired tension before
switching to the cut-off function causing a loose clamp. Clamping on softer objects requires
a longer timing.
-Cut-off timing set too long may slow production and cause operator to twist the tool during
application. This may damage tool and/or clamp.
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
Maintenance: Cutoff Timing Adjustment
www.BAND-IT-IDEX.com
Page 35 of 36
IT1000-C / IT2000-C
1/4" IT Tool
Document # P49050 Rev. C
© Copyright
BAND-IT-IDEX, Inc. 2015
All rights reserved

Advertisement

loading

This manual is also suitable for:

It2000-c