Placing Into Operation
2 P
I
LACING
2.1 P
P
RE
OWER
System general appearance good
Cabinet colour and condition good
Cabinet keyed 003
All circuit boards firmly fastened
Manual call point fitted & functional
Viewing window clear and firmly secured
Cable entries adequately sealed
240 VAC cabling correctly terminated
All earthing secured
Power supply securely mounted
Power supply correctly wired
All ribbon cables firmly secured
All other components securely inserted
LCM boards correctly addressed and all analogue loops have been tested as per section 9.6.4.2
BC-200 manufacturing label affixed
You are now ready to power up the BC-200 Fire Indicator Panel.
Note:
When re-booting the panel, power off for at least 10 seconds or LCM modules might not operate correctly.
2.2 P
U
OWER
Ensure batteries are disconnected.
Turn mains switch To "ON"
After a few seconds, some power-up information should be displayed on the LCD screen, which will then
clear and display the alarm screen.
Under normal conditions the "NO ALARMS" message will be displayed.
The indicator LED's on the rear of the CPU board will flash on and off.
The MAINS ON and FIRE FIGHTER lamps will be lit.
Connect the batteries.
Caution!!
Incorrect polarity of batteries may cause permanent and serious damage to the system.
Check for system faults by pressing, "Service Menu", "List", "Faults". If there are any faults, either rectify
or note in fault log on following page
Y
OU ARE NOW READY TO COMMENCE USING THE
BC-200 Manual – P/N DOC-01-013
O
NTO
PERATION
-U
C
P
HECKS
C
P
HECKLIST
BC-200
C
HECKLIST
.
FIRE PANEL
8