5 Installation
1. Allow access to two of the required mounting holes in the base body of the stage.
Possible measures:
−
−
2. Affix the upper L-509 to both mounting holes made accessible in the lower L-509:
Tighten the screws in the mounting holes completely (p. 55).
3. Repeat steps 1 and 2 for the two other required mounting holes in the base body of the
upper stage.
4. Check that the upper stage is affixed firmly.
5.5.3
Setting Up a Z System
NOTICE
Screws that are too long!
Screws and locating pins that are inserted too deeply can damage the lower stage.
Observe the depth of the mounting holes in the motion platform (p. 52) of the
lower stage.
Only use screws and locating pins of the correct length for the respective
mounting holes.
Designations in these instructions:
Lower stage: X axis in an XZ combination; Y axis in an XYZ combination. The stage on
which the upper stage is mounted using an adapter bracket.
Upper stage: Forms the Z axis of the multi-axis system, is mounted in a vertical alignment to
the lower stage with an adapter bracket.
Examples of XZ systems consisting of two L-509s and an adapter bracket
1
Lower stage
2
Adapter bracket
3
Upper stage
28
Version: 1.1.0
Temporary start-up of the upper stage (p. 33) and commanding the platform to a
suitable position
Moving the motion platform manually (p. 43)
MP141E
L-509 Stage