5 Installation
5.5.2
Setting Up an XY System
NOTICE
Screws that are too long!
Screws and locating pins that are inserted too deeply can damage the lower stage.
Observe the depth of the mounting holes in the motion platform (p. 52) of the lower
stage.
Only use screws and locating pins of the correct length for the respective mounting
holes.
Designations in these instructions:
Lower stage: Forms the basis of the multi-axis system (X axis), is attached to a surface
Upper stage: Forms the Y axis of the multi-axis system, is attached to the lower stage
rotated by 90°
Figure 8: Example of an XY system consisting of two L-509
Requirements
You have read and understood the general notes on installation (p. 17).
You have read and understood the general notes on setting up a multi-axis system (p.
25).
You have accounted for the space required to route cables without bending and
according to regulations.
You have properly mounted the lower stage onto a surface (p. 19).
Tools and accessories
4 screws, ISO 4762 M4x14 from the scope of delivery of the upper stage
Allen wrench AF 3
26
Version: 1.1.0
MP141E
L-509 Stage